Karlskoga (SE)

The Synthetic Site Folder and Site Brief are available for free.
Please register and login to access the Complete Site Folder.

Data

Karlskoga (SE)

Scale L urban and architectural
Team representative urbanist, landscape architect & architect
Location South of Karlskoga
Population 27,500 inhabitants
Strategic site 86 ha - Project site 49 ha

Site proposed by Municipality of Karlskoga
Actors involved Municipality of Karlskoga
Owner(s) of the site Municipality of Karlskoga

Commission after competition urban studies for the municipality

More Information

Urban City Strategy

Currently in planning, the Nobel railway line will be a new fast train between Stockholm and Oslo, connecting the two capitals where the Nobel Prize is awarded every year, shortening the travel time to less than three hours. A new station for the Nobel railway line is proposed in Karlskoga. Faster commuting opportunities and accessibility will provide great benefits for business and economy, but also for Karlskoga as an attractive place to live.
The station and the travel-hub is located in the south part of the town and the area will be developed into a mixed use and residential district, connected to the rest of Karlskoga and the nature around it. The aim for the district is to be well designed, logistically smooth, and environmentally at the forefront.
The area shall contain many urban functions such as multi-family houses, offices and different functions such as production facilities, schools, shops, various services and parks.

Site Definition

The town of Karlskoga is placed in a region largely covered by forests and and the area contains many rivers and lakes. It is also set within the heart of Sweden’s historical iron production district. Karlskoga was the home of the industrialist Alfred Nobel and the company Bofors, once Sweden’s largest iron producer. Today, Karlskoga is again a growing town with an expanding and more diversified industrial sector.
The competition area is placed on the western side of lake Möckeln, and its shore contributes to the unique character of the cultural landscape. Today, the area contains mostly nature and agricultural land. The land is owned by the municipality.
A study of the future location for the Nobel railway line points out the proposed site connected with a bridge over lake Möckeln and a station directly south of Storängen shopping area. The bridge may double as a future pass-by of the E18 motorway.

How Must Metabolism and Inclusivity Be Developped and Connected?

The ambition of the municipality of Karlskoga is to build a district around the new station for future generations, to create a place that people will be proud of for a long time and where sustainability is a key aspect in terms of social, economic, technological and environmental aspects. The municipality considers sustainability as primarily aiming at achieving qualities that will last for a very long time.
As sound and carefully designed external and internal environments affect people’s health and well-being positively, the municipality must build with technical and architectural quality, using material and methods with low energy and carbon emissions, low heat consumption and with a smart infrastructure.
A sustainable development must also consider its relationship to the landscape. Nature has a great social significance and is also very important from an ecological perspective.
The station district shall connect to the other areas of the town. A well-connected area also benefits accessibility and safety for all. Both the road network and layout of buildings contribute to this.
Pedestrian and bicycle routes within the area and their connections to existing network must be shown. The environment around the pedestrian and bicycle lanes must be inviting, exciting and varied for all people in the area.
The “Convention on the Rights of the Child” has a strong judicial standing and status as Swedish law. The design of the area must take into consideration the best interest of children.
The competition proposal shall demonstrate how aspects of gender equality are considered.
Ideas for handling surface water shall be explained.

Questions on the site

What’s the height of the bridge at each point along the study site?

The final decision about the exact track position including track height is not made yet. At the earliest it could be set late 2022, probably later. So we have to plan from the study that the municipalities ordered a couple of years ago for their strategic planning. In the additional study that White architect made in 2019 both track heights and ground heights are shown. See that as an upper level for the track height. West of the proposed station area is the highway and west of that a ridge. Therefor it does not seem realistic that that the track height would be as low as ground level. We can´t be more specific at this moment.

Can we modify the path of the highway/train rails or is it set in stone?

As explained in the answer above the exact track position including track height is not made yet. So the location can be slightly modified, most obvious to the north or the south. There can however not be any bends on the railway track since the trains must pass at a speed of 250 km/h.

Can we intervene and modify the planning (roads, accesses…) around the station?

In principle roads, access etc can be modified. The White study shows just an example that you don´t need to follow. To change the position of the existing national highway might be challenging though, but not impossible if you can come up with a creative solution.

This site is connected to the following theme

Care
Valorizing Natural Elements and Landscapes

Care is about recognizing the vulnerability of our living milieu. It is about finding new design ways to pay attention to marginalized, hurt, or ignored areas and help to repair them.
These sites are located at the edge of parks and forests or situated within agricultural or planted areas. The projects’ actors have to embrace mechanisms of care for natural and manmade landscapes. The sites may be transformed into interfaces with porous edges to support the habitats of the landscapes.

Specific documents

Questions on the site

Fr. 18 June 2021
Deadline for submitting questions

Fr. 2 July 2021
Deadline for answers

Before submitting a question, make sure it does not already appear in the FAQ.

You have to be connected –and therefore registered– to be able to ask a question.

Please ask questions on sites in the Sites section.
Please ask questions on rules in the Rules section.

If your question does not receive any answer in 10 days, check the FAQ to make sure the answer does not appear under another label or email the secretariat concerned by the question (national secretariat for the sites, European secretariat for the rules).