Alzira (ES)

Les Dossiers synthétiques et d'enjeux sont disponibles gratuitement.
Merci de vous inscrire et vous connecter pour accéder au Dossier complet de site.

Données synthétiques

Alzira (ES)

Scale L urban / S architectural
Team representative architect, town planner, landscaper
Location Alzira, Valencia
Population 44,352 inhabitants
Strategic site 12.5 ha - Project site 10.945 sqm

Site proposed by Valencia Regional Government
Actors involved Alzira Municipality
Owner(s) of the site Public/private

Commission after competition Urban development & architecture works

Information complémentaire

Urban City Strategy

At facing new challenges and social dynamics, the Alzira Municipal Council ambitions exploring new ways towards urban and environmental sustainability by innovative means that will favour its resilience. It aims at solving problems inherent to disseminated suburbia, alike the isolation and disconnection of the existing neighbourhoods El Torretxo and l’Alquerieta, prioritizing its articulation and urban contextualization. Inclusivity, accessibility and equity must stand as the singular objective of the proposed intervention.
This peripheral condition also offers the possibility to rethink the municipality’s connexions, suggesting new accessing possibilities to the city and the main hospital, integrating diverse pre-existing realities and generating a new urban landscape that emerges from a multi-scalar analysis..

Site Definition

The city of Alzira awaits an exemplary action in terms of environmental, social and economical sustainability, responsible with the environment and having a direct impact on the citizens’ life standard. The site englobes an unbuilt ground zone, abandoned agricultural fields located in between the degraded urban fabric of the Alquerieta neighbourhood, together with the disseminated residential buildings of the Torretxó that characterises periphery. This enclave is a strategic hinge between pre-existing and consolidated fabrics. Furthermore, it represents a unique opportunity because urbanisation will permit relocating lots to a flood-free height and enhance matters relating to mobility and connectivity. Public titularity of most of the ground offers the possibility to develop this sector with a holistic project that considers residential uses, allocations and public spaces, starting with a thought on matters such as the city limits, its integration potential and the enhancement of its resilience capacity.

How Must Metabolism and Inclusivity Be Developped and Connected?

The proposed site is located in a free urban land sector that the municipality is currently developing. This growth area is being incorporated to the urban system, bringing the opportunity to integrate the different pre-existing urban fabrics within an equipment program and by prioritizing connexions with the county hospital, as well as the city’s accessibility.
The sector location in relation to the consolidated city implies connecting the necessary elements to obtain an adequate integration, based on sustainable urban mobility on different transportation means (prioritizing intermodal nodes and pedestrian and bike mobility).
The limits of the proposed lot aim at assessing the efficiency and efficacy of the transformation processes. The point is to minimize environmental impact through bioclimatic strategies applied to the project and its construction, and to optimize the passive reaction of the climatic environment through the building's program, its shape, orientation, resorting to natural ventilation.
This proposal sets the starting point for a dynamic, inclusive plan that spans several zones of the city with different economic, social and cultural profiles. The mix of uses and the set-objectives of design innovation and the sustainable materiality of the building will contribute to this plan.

Questions à propos du site

À venir...

Le site est lié au thème suivant

Revitalisation
Rendre les territoires performatifs

Sur ces sites, l'impulsion de la transformation vient du territoire et de l'utilisation de toutes les ressources (naturelles, écologiques, infrastructurelles) pour le régénérer.
Ici, le territoire a besoin de se reconnecter à son contexte social pour ajouter de nouvelles qualités créatives et culturelles.

Documents spécifiques

Questions à propos du site

Ve. 18 Juin 2021
Date limite de soumission des questions

Ve. 2 juillet 2021
Date limite de réponses aux questions

Avant de soumettre votre question, assurez-vous qu'elle n'apparaît pas déjà dans la FAQ.

Pour pouvoir poser une question, vous devez être connecté (et, par conséquent, inscrit au concours).

Merci de poser vos questions sur les sites dans le menu Sites.
Merci de poser vos questions sur le règlement dans le menu Règlement.

Si votre question ne reçoit pas de réponse dans les 10 jours, merci de vérifier qu'elle ne figure pas dans la FAQ sous un autre intitulé ; sinon, contactez le secrétariat concerné par email (secrétariats nationaux pour les sites, secrétariat européen pour le règlement.)

View of L'Alquerieta
View of El Torretxó
View of the hospital
View of the school and the site